LF-R250 CAMP D AVON BRIOUX
Closure planned
- Status
- LF-R250 CAMP D AVON BRIOUX is not currently reported as active. An activation is planned.
- Activation
- (activation planned)
- Type
- Restricted Area (R)
- Height
- 610 m2.000 ftGND
History
No activation is recorded for the period covered here.
Source
According to NOTAM R2463/26, as of 03/09/2026 at 12:37. Open the publication
Publication AIP France ENR 5.1Edition AIP France, SIA eAIP AIRAC 2026-08-06, effective 06 AUG 2026, valid until 02 SEP 2026Section ENR 5.1-1AIP France ENR 5.1