ZRT CORRIDOR NE
Closure planned
- Status
- ZRT CORRIDOR NE is not currently reported as active. An activation is planned.
- Activation
- (activation planned)
- Type
- ZRT (Zone Réglementée Temporaire)
- Height
- 1.980 mFL651.219 m4.000 ft
Conditions
Source wording
à l'exclusion de la partie interférente avec la ZRT Corridor SE lorsqu'elle est active.
History
No activation is recorded for the period covered here.
Source
According to NOTAM R2793/26, as of 23/09/2026 at 09:38. Open the publication
Publication AIP France SUP 146/26Edition 25 JUN 2026AIP France SUP 146/26